Secretary: Jasmine CancinoWebsite Manager: Htet AungMarketing Director: Katie ArmenterosSenior Advisor: Daniel Perez LopezProfessional Development: Victor Miguel
Team Leads
Commercial: Angel DiazCommercial: Kevin JueConcrete: Luis DelgadoDBIA: Daneil Perez LopezHeavy Civil: Joseph TrujilloMixed Use: Mohammad GealaniDesign Build: Adam KerrPreconstruction: Derek RamosSustainability: Michael YamaguchiVDC: Adrian Naranjo
Concrete Solutions
The Concrete Solutions track focuses specifically on the concrete sequence of the project. Engineers are tasked with creating a schedule, estimate, and site logistics plan to tackle a variety of concrete focused issues. There is heavy emphasis on pour plans, site logistics, and labor rates. Team members are tasked with presenting to judges as a self-perform entity of a general contractor.
Awards
2018 – 2nd Place
Problem Sponsor: Sundt Construction
Design-Build
Given a Request for Proposal from an Owner, the team works together as a single Design-Build entity to develop a design, estimate, schedule, and site logistics for the project. Members will be assigned roles such as Project Executive, Project Manager, Preconstruction Manager, Superintendent, Principal Architect, and Lead Designer. The team will need to present their proposal and convince the Owner that the proposed plan is worth the Owner’s contract.
Problem Sponsor: Swinerton
Commercial
Commercial competition is a design-bid-build contract type. The problem statement is directly applicable to the construction industry, dealing with real-world problems as industry professionals previously saw them. As a member of the Commercial team, one will gain experience in the most common contract method in the construction industry and meet professionals that will assist in developing one’s knowledge.
Awards
2021 – 3rd Place 2020 – 2nd Place 2019 – 3rd Place 2018 – 1st Place 2018 – 4th Place, DBIA Regionals
Problem Sponsor: Mortenson
Heavy Civil
Heavy Civil construction involves highways, dams, ports, and bridges, and overpasses. The team mainly focuses on government infrastructure. We work with the plans to produce an estimate, schedule and site plan. Examples of projects the team has worked on are: Las Vegas Strip land bridge, South Tahoe highway renovations, and a bridge reconstruction in Santa Barbara
Problem Sponsor: Kiewit
Integrated Project Delivery
Present and defend a new form of construction contracting where owner, prime-constructor, and prime-designer will be coordinated. This delivery method will integrate people, systems, business structures, and practices to optimize project results..
Awards
2024- 3rd Place
Problem Sponsor: Clark Construction
Mixed-Use
Mixed Use will assess the team’s understanding of key responsibilities for Project Engineers in our industry including prob estimating, scheduling, plan reading, bid analysis, site logistics, and quantity takeoffs. Mixed Use construction typically involves a bottom story for commercial use, followed by residential apartments in the above floors. Successful teams will display a thorough understanding of the project and provide well thought out solutions to subjects and problems issued throughout the competition.
Awards
2020 – 2nd Place 2018 – 2nd Place
Team A Team B
Problem Sponsor: Morley Builders
Preconstruction
Preconstruction is the engineering and planning that occurs before the construction of a building begins! We are given the description of a building and must create a complete schedule, estimate, and site logistics plan to present to the “owner” (PCL Construction), along with schedule and cost analysis of addendums that are released the day of competition.
Awards
2023 – MVP Award, Porscha Outlaw 2019 – 1st Place 2018 – 2nd Place
Problem Sponsor: PCL Construction
Project Management
Project Management is highly focused on the details of construction management. The competition involves reviewing all contracts and documents for the project, including all subcontractors and owner contracts. The main goal of the Project Management team is to review all aspects of a given project and conduct a risk assessment for the overall project.
Awards
2023 – 3rd Place
Problem Sponsor: DPR Construction
Sustainability
Sustainability’s main objectives are to understand how sustainability is integrated into construction projects and to recognize the importance of minimizing our negative impact on the environment. By becoming familiar with LEED, Living Building Challenge, and Envision cred- its, we can thoroughly analyze con- struction projects and propose design changes, comparisons, or mitigation procedures etc. The long-term goal is for all future projects to achieve net zero energy.
Awards
2023 – 1st Place 2022 – 4th Place & Best Presentation 2021 – 3rd Place 2020 – 1st Place 2019 – 2nd Place
Team ATeam B
Problem Sponsor: Skanska
Virtual Design and Construction
VDC is the virtual design and construction team. We work with Building Information Modeling (BIM) software programs to help guide construction and identify clashes before they come up in the field. VDC focuses on three aspects: 3D Logistics and Coordination, 4D Scheduling, and 5D Estimation. For each focus, we learn different softwares to solve the different problems.
Awards
2022 – 2nd Place 2020 – 2nd Place
Problem Sponsor: Webcor
Alternates
Help create a proposal per commercial contract, including scheduling, estimating, site logistics, and risk assessment.
Awards
2024- 3rd Place (Team 23)
2023 – 1st Place (Team 25 – Miguel Hernandez), 2nd Place (Team 6 – Jonathan Bonilla), 3rd Place (Team 5 – Aditya Khalane) 2022 – 1st Place (Team 23 – Jorge Wu) 2021 – 2nd Place (Team 13 – Shinju Escobar, Phoenix Robledo) 2021 – 3rd Place (Team 12 – Gustavo Oseguera) 2020 – 1st Place (Team 6 – Ruihao Zhu)